Model attachment of the contract for construction

2022-08-19
  • Detail

Annex model of highway engineering construction supervision contract

annex a form, scope and content of supervision service

I. form of supervision service

1 service requirements

example: requirements for the qualification of the supervision unit, the main methods of supervision service and the subordinate relationship of supervision work

2 the organization

recognizes the requirements for the setting of supervision service institutions, the arrangement of work plans, and the qualifications of key personnel

II. Scope of supervision services

1 scope of services

example: the scope of work and scope of work covered by supervision services

2service objective

example: the nature of supervision service the electro-hydraulic servo zigzag experimental machine of Jinan new era Gold Testing Instrument Co., Ltd. adopts the frame potential structure, purpose and main work objectives

III. contents of supervision services

example: the specific supervision work in each stage of supervision services listed in this article should be summarized mainly with reference to the contents of the code for construction supervision of Highway Engineering (JTJ), and supplemented according to the specific conditions of the project

1 prepare supervision plan or plan

2 be familiar with the contract documents and the construction site

3 participate in the pillar and design disclosure, and review the retest results and construction drawing design submitted by the contractor

4 supervise and inspect the contractor to establish a quality assurance system; Aviation grade aluminum alloy thick plates are mostly rolled with heat-treatable aluminum alloy

5. Preside over the first site meeting and regular site meeting

6 the commencement report of the single project has been released and approved

7 review the qualifications of the permanent representative authorized by the contractor and other main technical and management personnel dispatched to the site

8 accept the Contractor's site laboratory and review its personnel qualifications

9 establish the supervision test and detection system, and carry out the supervision test and detection independently according to the specified frequency; Pressure it is to adapt to the relatively large tension machine to stop working

10 approve the quality, process test and standard test of raw materials and complete sets of equipment proposed by the contractor for the project

11 review the performance and quantity of mechanical equipment proposed by the contractor for the project

12 examine and approve the Contractor's construction scheme and main methods or processes for the implementation of the project

13 review the qualifications of subcontracts and subcontractors, and control the quality of important purchased finished parts or semi-finished parts

14 examine and approve the overall progress plan submitted by the contractor, check and urge the contractor to implement the progress plan, and approve the Contractor's revised plan

15 require the contractor to carry out construction in accordance with the contract conditions, technical specifications and supervision procedures, and comprehensively supervise, inspect and control the project quality by means of on-site inspection, inspection, testing and overall acceptance

16 issue intermediate handover certificate

17 investigate and deal with project quality defects and accidents. In case of major quality accidents, urge the contractor to report to the relevant departments as required

18 issue stop work order

19 accurately measure the completed works

20 issue interim payment vouchers

zi issues a change order

22 accept contract matters, evaluate and deal with them according to the provisions of the contract

23 deal with breach of contract, coordinate disputes, and testify in the arbitration process according to the provisions of the contract

24 prepare monthly, quarterly and annual reports of supervision work

25 evaluate the Contractor's handover application, and organize the inspection and acceptance of the project to be handed over

26 issue the handover certificate

27 supervise and inspect the contractor to prepare completion documents according to the requirements of the project management department and business students

28 prepare completion documents for supervision

29 supervise the contractor to carefully implement the work plan in the defect period, inspect and accept the remaining works, investigate the causes of defects and diseases in the delivered works, and determine the corresponding

30 issue the project defect liability termination certificate

31 issue the final payment certificate

32 cooperate with the owner in the completion acceptance and project handover

33 others

IV. authorization of the business student to the supervision unit

example: the business student hereby clarifies: the scope of responsibility and authority of the supervision unit when accompanying the supervision service according to the supervision contract, as well as other powers granted to the supervision unit according to the characteristics of the project or the project

v. basis of supervision service

example 1: supervision contract

2 formal contracts, agreements and annexes signed by the business student and a third party

3 contract drawings and descriptions

4 contract bill of quantities and description

5 standard drawings, technical specifications, engineering quality inspection and evaluation standards, test procedures, etc. specified in the contract

6 supervision regulations issued by the state, the Ministry of communications, and the province and city where the project is located

7 others

VI. other parties can change the contents of this annex by signing a supplementary agreement

owner: (seal) supervision unit: (seal)

authorized representative: (signature) authorized representative: (signature)

month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month month Data:

1 copies of the contract agreement and conditions signed by the owner and the contractor

2 copies of priced bill of quantities and its description jointly confirmed by the owner and the contractor

3 copies of contract drawings and relevant standard drawings and descriptions

4 copies of technical specifications, inspection and evaluation standards, and operating procedures specified in the contract

5 others

II. Decision making and decision

example: the owner agrees to make decisions or decisions in time according to the instructions of the supervision unit on major issues such as construction period, quality, investment, contract and safety of the project or the project

both parties hereby agree that the owner is responsible for the above