Construction engineering design contract (3) model text

construction engineering design contract

both parties of the contract:

construction unit:, hereinafter referred to as Party A

design unit: hereinafter referred to as Party B servo electromechanical drive ball screw to apply experimental force

after full negotiation between Party A and Party B, this contract is hereby signed for mutual compliance

Article 1 project name, scale, investment amount and construction site

Party A entrusts Party B to undertake the design project of the project, with a construction and installation area of square meters, and the total approved investment is 10000 yuan. The construction site is

Article 2 Party A's obligations

1. Party A shall submit to Party B the design assignment, project site selection report, agreement documents in terms of raw materials (or approved resource report), fuel, water, electricity, transportation, etc., survey data that can meet the requirements of the preliminary design, and technical data that need to be obtained through scientific research, which have been approved by the superior before. Party A shall provide the approved preliminary design documents, the survey data and construction conditions that can meet the requirements of the construction drawing design, as well as the technical data of relevant equipment before the construction drawing design on

Party A is responsible for the accuracy of the above information

2. Handle the approval of design documents in each design stage in time

3. Before the commencement of the project, Party A shall organize relevant construction units and Party B shall carry out design and technical disclosure; After the completion of the project, Party A shall notify Party B to participate in the completion acceptance

4. When the designers enter the construction site to work, Party A shall provide necessary working conditions and make it convenient in life. In the process of design and construction, due to the special needs of technology, Party A shall be responsible for all costs and travel expenses to other places to cooperate with Party A

5. Party a must maintain Party B's design documents and shall not modify them without authorization. Without Party B's consent, Party A shall not copy, reuse or expand the construction scope without authorization

6. Party A has the obligation to keep Party B's design results confidential and shall not transfer them to a third party for reuse without permission

Article 3 Party B's obligations

1. Party B must deliver the preliminary design documents to Party A before MM DD YY; Deliver the technical design documents to Party A before MM DD YY; Deliver the construction drawing design documents to Party A before MM DD YY. Among them, the preliminary design documents are in copies, the technical design documents are in copies, and the construction drawing design documents are in copies. Party A needs to increase the number of copies of documents, which requires model fees and charges separately Party B must submit all design documents (including budget estimate documents, list of materials and equipment) to Party A before

(for large-scale construction and installation projects, Party A and Party B can design in stages according to the specific situation. When the design conditions are met, both parties sign a stage design contract. It specifically stipulates that the name and date of the design data of each stage that Party A should submit, and the date of Party B's delivery of the design documents, as annexes to this contract, see Annex (2)

2. Party B must put forward survey technical requirements and design according to the approved design specification or the approval documents of the previous stage design, as well as the relevant design technical and economic agreement documents, design standards, technical specifications, procedures, quotas, etc., and submit design documents that meet the quality

3. After the preliminary design is reviewed by the superior competent department, Party B shall be responsible for the necessary modifications within the scope of the original assignment

4. The design unit shall cooperate with the construction of the construction project for which it undertakes the design task, carry out technical disclosure before construction, solve relevant design problems during construction, be responsible for design changes and budget modifications, and participate in the acceptance of concealed works and project completion acceptance

Article 4 modification and suspension of design

1. If Party A requires to modify the design of the project for some reason, with the consent of Party B, unless the delivery time of the design documents is otherwise determined, Party A shall pay an additional design fee of RMB per working day according to the actual rework and modification working days of Party B, or calculate according to the percentage of rework work in the design stage

2. Thermal conductivity of the original task: if there is a major change in the flat plate direct method, and the design is reworked or modified, there must be a written opinion from the design approval authority or the design task approval authority, and a separate contract shall be signed after negotiation between both parties. The payment of the design cost that has been carried out shall be calculated according to the method in the preceding article

3. If Party A requires to stop the design in the middle of the process for some reason, it shall timely notify Party B in writing that the paid design fee will not be refunded, and the design fee will be increased and settled according to the actual working days in the continuous fluctuation stage of the raw material price, and the contract relationship will be ended at the same time

Article 5 quantity and delivery method of design fee

within days after the effectiveness of this design contract, Party A shall pay Party B a deposit equivalent to% of the design fee. After the performance of the design contract, the deposit shall be used as the design fee; Within days after Party B submits the preliminary design scheme to Party A, Party A shall pay% of the design fee to Party B; Within days after Party B submits the construction drawing documents to Party A, Party A shall settle all the design fees from Party B (for large-scale projects with a long design cycle, the design fees at the construction drawing stage can be allocated separately after the completion of the design of individual projects)

Article 6 reward and breach of contract

1. Within a reasonable project investment control number, if Party B saves the project investment due to the use of advanced technology or reasonable suggestions, Party B may be rewarded with% of the saved investment

2. Due to Party A's failure to provide relevant design materials on time and accurately, Party B cannot carry out the design or cause design rework. In addition to delaying the delivery date of the design documents, Party A shall also pay an additional design fee of RMB per day according to the actual lost working days of Party B

3. If Party A fails to pay the deposit and design fee to Party B within the time specified in the contract, it shall pay the liquidated damages to Party B according to the bank's provisions on deferred payment

4. If the delivery time of the design documents is delayed due to Party B's reason, Party B shall pay Party A liquidated damages equivalent to% of the design fee for each day of delay (Party A)